Paul Sandoval Campus Construction Displaced Student Parking
Construction on a new auditorium and clinic has forced students to park on nearby residential streets.
Updated on Sept. 28, 2026 in Secondary Education

Live Poll
Should your local government prioritize neighborhood safety regulations over student parking needs?
Ongoing construction projects at the Paul Sandoval campus have removed all on-campus student parking, forcing student vehicles into surrounding residential neighborhoods. These changes were communicated to families shortly before the start of the current school year.
Why it matters
The loss of parking spaces, combined with student enrollment growth since 2021, has led to increased traffic congestion and safety concerns in local streets. Families are reporting that students now require an additional 20 minutes to arrive at school.
All on-campus student parking spaces are currently occupied by construction equipment and materials. While a long-term solution remains pending, school security is patrolling the area to manage traffic impacts.
The players
Denver Public Schools
The local school district managing infrastructure projects and seeking potential shuttle or overflow parking solutions for students.
Denver Police Department
The local law enforcement agency responsible for public safety and recent traffic signal adjustments at East 54th Avenue and Central Park Boulevard.
Denver Parks and Recreation
The municipal department currently in discussions regarding the possible use of their fields to provide temporary student parking.
The details
The construction of a new health clinic and auditorium on the Paul Sandoval campus has eliminated available student vehicle space, forcing students to park on both sides of residential streets. This congestion currently impacts access to crosswalks, alleys, and fire hydrants in the area south and west of the school. In response to the traffic flow changes, the Denver Police Department has modified the traffic signal timing at the intersection of East 54th Avenue and Central Park Boulevard.
Timeline
Growth in student parking congestion was first noted in 2021.
Families were notified of the parking loss in September 2026.
Construction is expected to be completed in fall 2027.
The Home Front
This parking shortage highlights how rapid student enrollment growth since 2021 has outpaced existing school facility infrastructure in the city. The situation follows a pattern where district-wide construction projects frequently necessitate shifts in neighborhood traffic and parking patterns.
If you live south or west of the Paul Sandoval campus, prepare for increased neighborhood traffic and potential visibility issues at intersections and fire hydrants. Monitor future communications from the school regarding a potential shuttle system or authorized overflow parking locations.
The takeaway
The construction project at the Paul Sandoval campus will continue to impact residential parking until completion in fall 2027. Families should check school communications regularly for updates on potential designated shuttle drop-off sites or overflow parking lot arrangements.
Further reading
For more updates on school facility changes, see Secondary Education.
Source note: This article includes information reported by Front Porch.
Live Poll
Should your local government prioritize neighborhood safety regulations over student parking needs?








